Start Canyon
Work

What we’ve shipped.

Three anonymized case studies. More publishing as projects complete. Real numbers, real workflows, no client logos.

Manufacturing proof table with metal components, packaging samples, quality documents, and finished goods
Operational view

Operational proof before platform claims

Case studies are framed around measurable workflow change: quote speed, order volume, coordination errors, and adoption.

Case study · Custom pricing engine
From 2-day quotation cycles to 2-minute quotes
Specialty label manufacturing — B2B / wholesale
2 days → 2 min
Quotation cycle
12% → 45%
Mobile orders share
+120%
Organic search traffic
50 → 200+
Customers managed, same admin headcount
Read the case →
Case study · Multi-portal operations platform
Three portals. Six factories. Three times the order volume.
Custom luxury manufacturer · six supplier factories across multiple countries
Order volume, same team
45 → 13 min
Per-order processing time
−92%
Supplier coordination errors
58% → 97%
Production status accuracy
Read the case →
Case study · Job management system
From quote Excel to automated job cards in 14 weeks
Precision engineering · CNC machining and subcon assembly
3 days → 4 hrs
Quote turnaround time
−68%
Job costing errors vs actual
14 weeks
Build and go-live
0
Spreadsheets still running in parallel
Read the case →
Case study · Batch traceability system
From paper batch records to full ingredient traceability
Food & beverage manufacturing — B2B / wholesale
4 hrs → 8 min
Recall trace time
0 paper
Batch records in circulation
100%
Lots traceable to supplier CoA
3 audits
Passed without findings since go-live
Read the case →
Case study · Component traceability system
From reel-level guesswork to full component traceability
Electronics contract manufacturing — PCB assembly
0 boards
Shipped without full traceability since go-live
−92%
Time to answer customer traceability queries
3 revisions
BOM revision errors caught before production
2 audits
Customer quality audits passed without NCRs
Read the case →
Case study · Project costing system
From estimated margins to actual job-level profitability
Metal fabrication — structural steel & sheet metal
15-25%
Margin variance discovered on 3 job types
−80%
Time to produce project cost report
0 spreadsheets
Running in parallel for job costing
4 weeks
Month-end close reduced from 3 weeks
Read the case →
Next step

If the master Excel is the bottleneck, let’s talk.

Reply within one Singapore business day. WhatsApp for faster routing.